After much setup, Flow was used to place the road on the terrain.
The road width was increased by 1.03 unit.
The road length was increased from 120353.40units (inches) to 120437.02units (unwrapped length, one side),
or reduced to 120289353.40 units per MoI reading.
The entrance and exit ramps of the terrain probably throw measurements off.
The two long terrain curves (copied edges) were Unwrap(ed), and the start and end widths as curves, were oriented line to line with the long
unwrapped curves. Do Planar. The center points of the start and end widths were found, and vertical line segments to unwrapped surface
established two points for orient line to line, to move the unwrap surface. Then do flow.
Projection did not seem to work for me, or was not done right. MoI4.
- Brian
Projection worked fine in MoI3. The file did take minute or so to load...
The projection separates to 441 curves...
|