Is it possible to "project" the operation time. maybe as an option to the calculation. for small stuff it can be a disabled option as not to bog the process, though when my file begins to get 1.5 to 2 gigs the calculation can take awhile and the need to "do somthing else" in the mean time arises.
Dont know if this is possible with MoI.
Thanks,
Burr
|